Skip to main content

Cybersecurity

SUMS (UN R156) Software Update Management Consulting

We support SUMS process development, ISO 24089 implementation, and update verification testing.

We support SUMS process development, ISO 24089 implementation, and update verification testing.

Why You Need This

Software Updates Need
a Management System Too

Does UN R156 apply to your product?
R156 type approval requires the manufacturer's SUMS Certificate of Compliance. In Korea, the amended Motor Vehicle Management Act (in force since August 2025) also sets software update obligations.
OTA updates: what must you demonstrate?
A failed or interrupted update must restore the previous version or reach a safe state, and this is checked by vehicle testing at type approval.
Received update requirements from an OEM?
The obligation lies with the manufacturer, but ECU software is often developed by suppliers. ISO 24089 also covers suppliers.

Service Introduction

SeonENS SUMS Consulting

We address UN R156 and ISO 24089 together and tailor our support to your role as a manufacturer or supplier.

SUMS Process Development
We establish the procedures examined in the assessment: versions, RXSWIN, compatibility checks, and type approval impact assessment.
ISO 24089 Process Implementation
We define update activities and connect them with ASPICE and ISO 26262 work products.
Update Verification Testing
On HIL and bench setups, we test normal updates as well as power loss, communication loss, and tampered packages.
Cybersecurity (R155) Integration
We handle authenticity and integrity protection of update packages together with ISO/SAE 21434 activities.

Service Areas

UN R156 and ISO 24089-Based Activities

Organization Level (SUMS)
  • Update policy and processes
  • Version and RXSWIN management
  • Type approval impact assessment
Project Level (ISO 24089)
  • Update requirements definition
  • Package composition and dependency management
  • User information definition
Verification (Update Testing)
  • Normal update and version check
  • Recovery from failure or interruption
  • Tampered package rejection

UN R156 Requirements Response

Requirement SeonENS Support
SUMS Certificate of Compliance SUMS process development and assessment support
RXSWIN, type approval impact Management system and assessment procedures
Update security Linkage with ISO/SAE 21434 activities
Additional OTA requirements Evidence through update verification testing

Update Verification Testing

Test What We Check
Normal update Version and RXSWIN readable through the standard interface
Failure, interruption Previous version restored or safe state reached
Execution preconditions No start when power is low or safe conditions are not met
Tampered, invalid package Packages with a wrong signature or target rejected
Post-update regression No unintended changes in functions, diagnostics, or communication

Consulting Process

Phase 1: Current State Diagnosis
  • Review of update procedures and roles
  • R156 and ISO 24089 gap analysis
  • Response roadmap
Phase 2: SUMS Process Development
  • Policy and process establishment
  • Version and RXSWIN management
  • Templates and guidelines
Phase 3: Product Application and Verification
  • Update requirements and package definition
  • Type approval impact assessment
  • Update verification testing
Phase 4: Assessment Response
  • SUMS assessment response
  • Type approval evidence preparation
  • OEM requirement response

Expected Benefits

Practical Benefits

  • Regulatory Response Foundation
  • An update management system that meets R156, Korean law, and OEM requirements.
  • One System with Cybersecurity
  • No separate CSMS and SUMS to maintain.
  • Updates Backed by Evidence
  • Test results, including failure cases, kept as evidence.

Start Your SUMS Response Now

Start Your SUMS
Response Now

Tell us your target product and update method (OTA or wired), and we will propose a response plan.

Tell us your target product and update method (OTA or wired), and we will propose a response plan.